A&ML Sarl Secures Kalimva River Diversion Project at Kibali Gold Mine
A&ML Sarl is proud to announce that it has been awarded the Kalimva River Diversion Project at the Kibali Gold Mine, one of the most significant gold mining operations in Africa. This achievement marks a major milestone in the company’s continued expansion and reinforces its position as a trusted partner in delivering complex mining and infrastructure solutions.
The Kalimva River Diversion Project is a critical and highly strategic initiative designed to support the long-term development of the Kalimva open pit. The project involves the safe and controlled diversion of a natural river currently intersecting the mining footprint, requiring a high level of engineering precision, environmental awareness, and operational expertise.
Through the implementation of carefully engineered diversion channels, water management systems, and earthworks, A&ML Sarl will ensure the protection of surrounding ecosystems while enabling uninterrupted mining activities. This project reflects the essential balance between operational efficiency and environmental stewardship that defines modern mining practices.
Engineering Excellence and Operational Capability
With a proven track record in open-pit mining operations, large-scale earthworks, and logistical coordination, A&ML Sarl brings the technical capacity and field experience required to successfully execute this complex project.
The deployment of a robust fleet—including excavators, articulated dump trucks (ADTs), dozers, and water bowsers—combined with highly skilled personnel, will enable efficient project execution in line with strict timelines and performance standards.
A&ML Sarl’s integrated approach ensures that every phase of the project, from planning to execution, is carried out with precision, safety, and accountability, aligning with international mining and engineering standards.
Commitment to Safety, Sustainability, and Local Impact
At the core of A&ML Sarl’s operations lies a strong commitment to health, safety, and environmental responsibility. The Kalimva River Diversion Project will be executed under strict safety protocols, ensuring the protection of all personnel and stakeholders involved.
Environmental sustainability remains a key priority. The diversion will be implemented in a manner that preserves natural water flow integrity, minimizes ecological disruption, and supports long-term environmental stability within the mining area.
In addition, the project will contribute to local economic development through job creation, skills transfer, and the engagement of local communities—further strengthening A&ML Sarl’s role as a responsible and community-focused operator.
A Strategic Partnership for Long-Term Success
This award reflects the confidence placed in A&ML Sarl by the Kibali Gold Mine and its stakeholders. It underscores the company’s ability to deliver reliable, innovative, and high-impact solutions in demanding operational environments.
By contributing to the successful development of the Kalimva open pit, A&ML Sarl plays a key role in supporting the long-term productivity and sustainability of the Kibali operation.
As the company continues to expand its footprint across the mining sector, this project stands as a testament to its vision of becoming a leading force in mining services and infrastructure development in the region.
Looking Ahead
A&ML Sarl remains committed to excellence, innovation, and continuous improvement. The Kalimva River Diversion Project represents not only a new chapter in the company’s journey, but also a strong foundation for future opportunities.
We look forward to delivering this project successfully and continuing to build strong, value-driven partnerships within the mining industry.